Difficulty

Very easy

Steps

3

Time Required

                          3 minutes            

Sections

1

  • Handle
  • 3 steps

Flags

0

  • BackKeurig K40

  • Full Screen

  • Options

  • History

  • Save to Favorites

  • Download PDF

  • Edit

  • Translate

  • Get Shareable Link

  • Embed This Guide

  • Notify Me of Changes

  • Stop Notifications

Introduction

What you need

Step 1

              Handle               
  • Unscrew one of the 2mm screws on the handle using a T15 screw head. Keep a firm grip on the device so it does not shift out of place.

Unscrew one of the 2mm screws on the handle using a T15 screw head. Keep a firm grip on the device so it does not shift out of place.

1024

Step 2

  • Flip the Keurig over and unscrew the other 2mm screw using the same screw head. Keep a firm grip on the device to prevent it from shifting or falling.

Flip the Keurig over and unscrew the other 2mm screw using the same screw head. Keep a firm grip on the device to prevent it from shifting or falling.

Step 3

  • Remove the lever by pulling it away from the Keurig.
  • Replace a new handle by putting the Keurig back together the same way it was taken apart.

Remove the lever by pulling it away from the Keurig.

Replace a new handle by putting the Keurig back together the same way it was taken apart.

To reassemble your device, follow these instructions in reverse order.

Cancel: I did not complete this guide.

                                                                                      One other person completed this guide.                                             

Author

                                      with 3 other contributors 

                    Andrew Bornemann                     

Member since: 02/08/2016

464 Reputation

                                      2 Guides authored                  



                       Badges:
                       17







                                                        +14 more badges                           

Team

                       USF Tampa, Team 6-1, Eyestone Spring 2016                        

                                                  Member of USF Tampa, Team 6-1, Eyestone Spring 2016 



                    USFT-EYESTONE-S16S6G1                     


                                            3 Members                     


                                            5 Guides authored